◉ HEADLINES

New problem found on undelivered Boeing 737 MAX planes

Supplier says two holes in fuselage of some aircraft may not have been drilled exactly as required

2:26 PM MYT

 

SAN JOSE – Boeing is investigating a new problem with its 737 MAX aircraft, reported German news agency dpa. 

A supplier has informed Boeing that two holes in the fuselage of some aircraft may not have been drilled exactly as required, the aircraft manufacturer announced yesterday.

Boeing currently estimates that around 50 aircraft that have not yet been delivered need to be reworked.

The head of the passenger aircraft division, Stan Deal, emphasised at the same time that the “potential problem” did not represent an immediate problem for flight safety and that the aircraft model could remain in operation.

Boeing’s quality controls are currently under particular scrutiny after a part of the fuselage of an Alaska Airlines 737-9 Max came loose in flight at the beginning of January. No one was injured.

During inspections, loose fastening elements were also found on other aircraft of the variant. However, around 170 aircraft of the affected variant have only recently been allowed to take off again following inspections.

Following the incident, the United States Federal Aviation Administration announced stricter inspections at Boeing, and some airlines intend to send their own inspectors to the production lines. Boeing chief executive Dave Calhoun assured that the company would improve quality control.

Supplier Spirit Aerosystems manufactures the fuselage of Boeing’s 737 aircraft models. Deliveries of 737 aircraft already had to be interrupted once last year due to faulty drill holes. The problem caused by Spirit was in the pressure bulkhead that closes off the aircraft cabin at the rear. – February 5, 2024

Topics

 

◉ Popular

No plans to scrap RON95 subsidies for T20 group for now : Loke

The government has no immediate plans to remove RON95 fuel subsidies for high-income earners, with Transport Minister Anthony Loke saying the Budi95 system will remain in place as Putrajaya prioritises a simpler and more efficient subsidy mechanism

PM Term Limit Bill falls two votes short in Dewan Rakyat, sparks disappointment among Madani MPs

The proposed constitutional amendment to cap the prime minister’s tenure at 10 years failed to secure a two-thirds majority in the Dewan Rakyat, drawing sharp reactions from leaders within the Madani coalition who described the outcome as a missed opportunity for institutional reform

Next FAM chief must ‘work 100 times harder’ to drive reforms: Hamidin

Incoming Football Association of Malaysia president must go beyond football knowledge and commit to governance and structural reforms

◉ Related