◉ HEADLINES

Not cracks, just leftover construction marks: Works Ministry confirms SPE flyover safety

Following public concern, ministry says inspections reveal no fractures, structure unaffected by visible lines

4:50 PM MYT

 

KUALA LUMPUR – The Works Ministry has confirmed there are no fractures on the Jalan Cheras flyover, assuring the safety of the Setiawangsa-Pantai Expressway (SPE) following public concern on increasingly visible cracks in the structure. 

In a post on social media on X today, the ministry said that the Malaysian Highway Authority (LLM), the expressway concessionaire, and its consultants had conducted a site inspection at 11pm last night.

“The apparent cracks depicted in the images are black lines left over from construction joints during previous concrete works. 

“Consultants also confirmed that the structure of the highway portal is safe and not affected by the black lines. An inspection report and safety verification will be prepared and submitted to the LLM,” the ministry added. 

Earlier today, minister Datuk Seri Alexander Nanta Linggi responded to an X post, raising concerns about how the crack in the flyover appeared to be getting bigger. 

Noting that he has instructed LLM and the SPE concessionaire to immediately look into the matter, the minister said the safety of all quarters, especially road users, must be prioritised. 

The SPE, fully opened on November 3 last year, features a dual carriageway and seven elevated interchanges.

The expressway is divided into four main sections, namely Kerinchi-Salak (Section 1), Salak-Pandan (Section 2), Pandan-Setiawangsa (Section 3) and Setiawangsa-Taman Melati (Section 4), spanning a total distance of f 20.7km.

It connects several other highways, including the SPRINT Expressway, Ampang-Kuala Lumpur Elevated Highway, Duta-Ulu Kelang Expressway and Kuala Lumpur Middle Ring Road 2, to enhance network efficiency and reduce congestion in Kuala Lumpur. – June 8, 2024

Topics

 

◉ Popular

No plans to scrap RON95 subsidies for T20 group for now : Loke

The government has no immediate plans to remove RON95 fuel subsidies for high-income earners, with Transport Minister Anthony Loke saying the Budi95 system will remain in place as Putrajaya prioritises a simpler and more efficient subsidy mechanism

PM Term Limit Bill falls two votes short in Dewan Rakyat, sparks disappointment among Madani MPs

The proposed constitutional amendment to cap the prime minister’s tenure at 10 years failed to secure a two-thirds majority in the Dewan Rakyat, drawing sharp reactions from leaders within the Madani coalition who described the outcome as a missed opportunity for institutional reform

Next FAM chief must ‘work 100 times harder’ to drive reforms: Hamidin

Incoming Football Association of Malaysia president must go beyond football knowledge and commit to governance and structural reforms

◉ Related