◉ HEADLINES

Malaysia Rail Link

Tambang ECRL belum dimuktamad, info tular hanya spekulasi

Malaysia Rail Link tegaskan kadar rasmi masih diperhalusi; rakyat diminta tunggu pengumuman sah Kementerian Pengangkutan

MRL takes swift flood mitigation action after Gombak locals claim ECRL site caused mud flood

Company rep says project passed all requirements, proactive steps taken with company providing aid and compensation to victims despite excessive rainfall, other construction sites there also contributing to the problem 

ECRL project owner denies claim trains can reach 351km/h

It is “inaccurate and misleading” to suggest that the East Coast Rail Link (ECRL) passenger train can reach speeds of up to 351km/h as it was never designed to be a high-speed train.

◉ Popular

Mahkamah benarkan rayuan Badan Peguam cabar DNAA Zahid

Panel tiga hakim memutuskan permohonan Badan Peguam bukan sesuatu yang remeh namun menimbulkan isu yang boleh dibicarakan yang wajar didengar pada peringkat substantif

Early start for Abang Bas in Putrajaya

When most Malaysians are getting some shut-eye before attending the National Day 2023 celebration at Dataran Putrajaya today, bus driver Mohammad Saudi Abd Sahiis is eagerly on the road to ferry passengers to the venue.

Ab Rauf sworn in for second term as Melaka chief minister

BN chairman retains Tanjung Bidara with an 8,615-vote majority as coalition secures two-thirds control of state assembly